Earlier this year, the Government introduced reforms to Biodiversity Net Gain (BNG), which has required most qualifying developments in England to deliver a 10% biodiversity net gain since 2024. The reforms represent a positive and pragmatic adjustment to a system that had, in practice, placed a disproportionate burden on some smaller development schemes.

For clients bringing forward small residential sites, infill development, rural schemes and constrained brownfield sites, the changes should mean a lower administrative burden, greater flexibility and, importantly, improved viability.

The reforms also provide a useful opportunity to reflect on what has worked well, and which lessons are worth carrying forward. William White, Planning Design Manager at RDC, shares his perspective.

A more proportionate system

From 6 August 2026, applications for developments on sites of 0.2 hectares or less are exempt from mandatory BNG, provided they do not impact priority habitat.

There is also greater flexibility for smaller developments that remain subject to BNG. Rather than first having to demonstrate that opportunities to deliver the required gain on-site have been exhausted, minor developments can now consider on-site and registered off-site provision together.

The intention is to make the system more proportionate and focus resources where the potential biodiversity outcomes are greater. In practical terms, this means reducing the regulatory and administrative burden on very small schemes, while directing more time, expertise and resources towards larger developments where there is generally greater scope to retain, create and enhance habitat at scale.

Further change is also on the horizon. In the 2026 Budget, the Government announced its intention to introduce a new exemption from mandatory BNG for residential brownfield developments on sites of up to 1.5 hectares in England.

The detailed regulations and implementation timetable are still to be confirmed, so the exemption is not yet in force. We will return to what this means for brownfield development once the detail is published.

Good news for small-site viability

Over the past two years we’ve seen how the cost and administrative requirements associated with BNG can weigh heavily on small developments. For many smaller schemes, these costs represent a disproportionately high percentage of the overall development costs, even where the site's ecological impacts are limited.

For small sites already working within tight margins, August should have marked a welcome shift. The reforms should help exempt schemes progress more efficiently through planning, while giving developers greater flexibility over how obligations are met where BNG still applies.

This is likely to be particularly valuable for small infill developments, village schemes and constrained brownfield sites, where accommodating a 10% net gain within the site itself has not always been straightforward.

Exempt from BNG does not mean exempt from ecology

However, an important distinction for developers is that exemption from mandatory BNG does not mean ecological considerations disappear from the planning process.

  • Protected species legislation still applies
  • The 0.2-hectare exemption does not apply where development impacts priority habitat
  • Tree retention, landscape character and green infrastructure remain important planning considerations

The most effective approach remains to understand these issues early.

What the last two years have taught us

Perhaps one of the most useful effects of mandatory BNG has been the way it has moved conversations about habitat and landscape further forward in the development process.

Project teams have become more conscious of existing habitats before layouts are fixed, creating greater opportunity to retain valuable features and integrate them successfully into a scheme.

Retaining an existing tree or hedgerow may be simpler than trying to compensate for its loss. Native planting, species-rich grassland, integrated bird and bat features, wildlife-friendly sustainable drainage and hedge boundaries can often be incorporated with relatively little impact on viability when they form part of the original design.

Addressing these considerations upfront can also help the same land work harder.

SuDS can contribute to both drainage and landscape quality. Planting can define streets and spaces while providing habitat. Green areas can provide amenity, biodiversity and drainage benefits at the same time.

In that sense, the strongest schemes are not necessarily those that allocate more land to biodiversity, but those that use the land available more intelligently.

The key is integration.

Greater flexibility – but a balance to strike

There are many sites where on-site provision simply does not make sense. The reforms recognise this, and greater access to off-site provision will make it easier for developers to choose the most effective and proportionate solution. For example, a constrained urban infill plot may have very limited scope to create valuable habitat. In that scenario, strategically located off-site provision could deliver considerably greater ecological value.

However, with this flexibility comes the risk that biodiversity becomes something that is purchased rather than designed. That matters because well-considered planting, retained habitats and green infrastructure can contribute to the character, attractiveness and long-term quality of a scheme, regardless of where the formal BNG requirement is delivered.

The availability of an off-site solution should therefore not mean automatically overlooking straightforward opportunities that could improve the development itself.

To avoid off-site provision becoming an automatic substitute for good design, we should ask two questions:

  • What biodiversity improvements genuinely make sense for this site?
  • What remaining BNG requirement is most efficiently and effectively delivered off-site?

What should developers take from the reforms?

The reforms create welcome flexibility for smaller development, and should reduce some of the cost, delay and complexity experienced since mandatory BNG was introduced. That is good news.

However, good development has always been about more than compliance. The opportunity now is to keep the best of what BNG has encouraged.

Early, integrated design is the best way to protect the site's existing assets, make the best use of the land available, and deliver lasting value.

More news

View all posts

The value of good architecture: why the right expertise matters

Paul Skepper, Principal Architect at RDC, explores what a good architect really brings to a project — and why involving the right expertise from the outset can make the difference.

Beyond Class Q: Exploring Permitted Development Opportunities for Rural Diversification

Class Q is often the first permitted development right that comes to mind when considering the future of agricultural buildings. But converting buildings to residential use is not the only option available to landowners.

The new National Planning Policy Framework (NPPF)

The new National Planning Policy Framework (NPPF) came into effect on 17 August, bringing further, immediate, changes to the way development proposals will be considered across England.